Showing posts with label Paint. Show all posts
Showing posts with label Paint. Show all posts

Wednesday, July 6, 2011

We're *this* close!

Yep, the title says it all!  It's nearly alllll ours!

We dropped by the house this afternoon and the cleaners were there and kindly let us have a quick look around!  Yesss!

The painters have been back and done all their little touch ups and repairs.

Here's the front of the house with the cladding painted in the correct colour - woollooware 



Much nicer than the icky grey it had been accidentally painted


Here's one of my boy's feature walls - Bristol Reservoir 


And here's my other son's feature wall - Bristol Regatta.  Loving both of them, nice splash of colour.


The towel rails have been removed and the correct one has been installed in the granny flat.

Some minor electrical's have been done such as fixing some of the bedroom lights.

Also, the carpet looks much better!  Someone has clearly been in to fix a couple of things and pulled it tighter because some of the random lumpy bits are gone and it is nice & straight against the skirting in our room!  Very happy about this as I thought we'd have to raise it at the final sign off.

Left to do...
  1. Clean some of the brickwork around the front & on porch
  2. Fill in some of the gaps between cladding & brickwork at the front
  3. WIP & WIR shelving
  4. Shower door in our ensuite 
  5. Fix the tiling in our ensuite and where the towel rail has been removed in main bathroom
  6. Install a shower head in bathroom
  7. Privacy lock in bathroom
  8. Silicone in bathrooms
  9. Touch catches in kitchen
  10. Garage step
  11. Manhole cover
  12. Light & fan in our bedroom isn't working
  13. Roof service
  14. Door service
  15. Fix dented window frame

Gee, so much has happened this week I'm kind of surprised there's so many things left to do!  Mainly small things though apart from the tiling.

Don't think we're quite ready for the final walk through this Friday as SS had hoped for but I'm not worried, we're only a matter of days off now....


Thursday, June 2, 2011

Paint (part 3) and so much more!

The Eden Brae tradies have been busy over the past week and our painting is all but finished now!  In fact as far as the painters are concerned, they are finished however they've painted the bathroom walls the wrong colour (notified SS last week but nothing was corrected!) and they haven't done the feature walls in the boy's bedrooms.

First thing we noticed this afternoon was that our lovely timber doors have had a coat of lacquer & the portico ceiling and lintels have been painted in surfmist.


Close up of walnut stain & clear lacquer


Eaves have been painted in surfmist


Down-pipes and meter box have been painted in Jasper


Cladding has finally been painted in Wooloware Woodlands Grey....what on earth?!  'B' is holding up the colour sample it was meant to be painted in.  Just a tad different!  Oops!


The tin of paint that dobbed...


Next we moved inside and saw that all the main painting has been finished and we LOVE it!!!  It's exactly the colour I was hoping for.  I love the warmth of it and the contrast to the Elusive White trims / doors without being too yellow / creamy.

Here's quite an accurate idea of the colour


Bedroom in granny flat


The painting wasn't the only happy surprise in the house!!  All of our air-conditioning ducts are now in, power-points are in, light switches on the walls and the plumbing has been done and is working!  We thought electrical & plumbing would be a week away.

Living Room in main part of the house - you can't really see but there's some TV points on the wall


Family Room - notice the light and air-con duct! 
(look at our swamp of a back-yard!)


Hello lovely!  We got the slightly bigger bath - 1700mm instead of 1500mm, mainly to fill the long bath hob.


Funnily enough, I don't mind the wrong paint colour in the bathroom as it matches well with the other colours (more so in real life) but it does draw attention the the 1200mm high wall tiles.  Wishing we went all the way up.  Oh well, once the correct white paint is on, shouldn't be so obvious.


Taps are in, we stuck with the standard range because we liked the look of them and I'm only 5 foot short tall so I like a shower head I can adjust.  

Just a note for anyone reading this still in the designing stage - get bigger shower niches.  The standard ones are 22cm high which doesn't fit any of the larger bottles of body wash, shampoo etc.  Still though, if that's our biggest regret....


Main bathroom vanity.  We upgraded to the next sink up in the range which I think was only an increase of $7.  Wish we could have gone extra spesh with the sink but the money fairy had long taken off by the time it came to choose bathroom upgrades.  Bitch.


And here we have our ensuite


Our hopefully still un-used toilet ;)



Our skylight & exhaust fan / heat lamps


Here's the granny flat bathroom, basically the same as our ensuite


This is the washer / dryer alcove with plumbing capped in the wall



Alarm pad & sensors are in


Plumbing in fridge space - bit of patching required


One of the boy's rooms.  We got ceiling fans in each of the bedrooms.  I'm not digging the fans at all though :(  They look cheap and yet cost $305 EACH!  Sob!


And here's one in all it's ugly-light-fitting-on-glory.


Took a pic of a discarded box hoping they got the model wrong.  Nope.  Oh well, will see if they can leave behind the caps and put down lights in instead.  Should make it look better.


Hmmm dented window frame


Our Dorf Veggie Sprayer tap is in


And lastly, a massive bone of contention with 'B'..... The Splash Back.........

Started off like this (they forgot to do behind the rangehood)


Then the tiler came back and did a lovely job but tiled around the rangehood (and as mentioned in a previous post, 'B' wants it tiled behind the rangeood in case we ever have to replace it and can't get the same profile, we don't have to worry).


Then 'B' went back on Monday night and noticed the tiler had been back and taken the rangehood down this time, only to do some make-do tiling thinking the rangehood would go on and it would never be noticed


And then we have today's efforts by the tiler (yet to be grouted).  It's more straight but some bits stick out more than others and there's still some dodgy looking make-do tiling going on.


See what I mean?



So there you have the latest!  All that's left now is:

  • Shower screens
  • Floors
  • Toilet roll holders / towel rails
  • Step in the garage (wondering if they've missed it?)
  • Fix some of the paint
  • Internal door hardware
  • WIP / Robe / linen cupboard shelving
  • Remaining couple of electrical bits & pieces 
  • Blinds & Shutters 

So close now!



Friday, May 27, 2011

Lick-o-paint! Part 2

Our painters have been busy and it appears 2 coats of high gloss Elusive White have now been put on all our doors and trims.  It's looking FANTASTIC!

Granny Flat


One of the boy's wardrobes


Close up


Internal door to Granny Flat


Our bedroom, looking at WIR & Ensuite


Granny Flat bathroom (standing in shower, looking out)


Main entrance into Granny Flat


Our front door, now with door handle


Gainsborough Tri-Lock Door Handle


Brickies have now fixed the section under bi-folds....much better!


Guessing by the end of next week our painting will be finished! Can't wait to see it.


Related Posts Plugin for WordPress, Blogger...