3 Month Maintenance Inspection

Hasn't time flown?  On the 15th November, we'll have been in our new home for 4 whole months!!  Feels like we've been here for years and only 5 minutes all wrapped up in one.

True to their word, Eden Brae came over on Tuesday to conduct their 3 month maintenance inspection.  Tim couldn't have been more helpful and happily wrote down everything on our list.  Even the missing toilet roll holder from the granny flat which technically was our mistake for missing it prior to hand over!

So, "How has the old new gal held up since moving in?", I hear you ask.... Pretty well.  Nothing major, really.  Here's our list...


1) Carpet in our bedroom still rippling and not secured at the edge near ensuite


2) Carpet edge in Living Room not secured properly and is fraying.  Di Lorenzo Carpet were really the weakest link in our whole home building experience.  Shockers!



3)  Few spots need to be re-grouted in all 3 bathrooms


4)  Some timber quad (trim) lifting in the kitchen

5) Patch & paint dent on pantry ceiling

6) A service and some sanding & re-staining required on bi-fold doors.  They're a bit 'sticky' to open which causes the doors to scrape on the bottom door frame.  Also, where they've patched some nail holes before staining is showing as a different colour.


7)  Patch & paint some damage on the Alfresco ceiling

8) One of the touch catches in the kitchen isn't working

9) Some of the floor boards near laundry are a little springy & one other spot seems un-even


10) Door lock on internal garage door doesn't work

11) A few cracked roof tiles that had never been fixed but should have been prior to handover

12) Cracked tile in Granny Flat ensuite where they've secured the shower screen


13) Toilet roll holder missing in Granny Flat ensuite

14) Repair brickwork at front of the house (this section has never been right!)



15) Point up some brick sections at front porch and clean down bricks

16) Stormwater pipe broken at end of driveway

No cracks in walls, no leaking pipes, all major appliances work i.e. air-conditioning, oven etc, so not too bad really.  Majority of these things were picked up within a couple of weeks of moving in so it's not like things have continued to deteriorate or anything.

You only get one chance to make a list by the way, so it helps if you write things down as you notice them.  Also, best to keep a few bricks just in case you need some replaced like we do at the front of the house.  If they had to order some more bricks, chances are they'll look a different colour as each batch slightly differs.  Also good to keep some spare roof tiles (make sure yours don't get taken away by the cleaners like ours did!)

Our Maintenance List has now been handed over to MGH Contracting to coordinate the relevant trades to do the repairs.  I heard from them the same afternoon Tim had been out and twice since.  Everything has already been pretty much confirmed and lined up for a few weeks time.  They ask you to provide about 3 dates within a week or two and then they try and get all the trades to come on one, maybe two of those days and then organise the painters to come on the last day if required.

Assuming all goes well from here, I'm impressed.  Again, this has been straight forward with no hassles.


Thursday, June 30, 2011

What a bad lay!

We were so excited to check out the house yesterday afternoon and as luck would have it the front door hadn't been pulled tightly enough closed so we could have a proper look around!

Started off well enough, the carpet had been installed by Di Lorenzo only that same day and the first room we saw looked pretty good.



Then we walked through to the Living Room and thought it strange to see the indentation and thought perhaps it was the crease where the carpet had been rolled....hmmmm....... (never noticed such a thing when I've had carpet laid on 2 other occasions though...)



But wait, it gets way more dodgy!  Then we walked into our bedroom.  


And if you can't see the sea of ripples above, check out how dodgy it looks against the skirting.  
There are no other words than WTF?!


A lovely little finishing touch!


How about the quality below!  Nothing like not lining up the lines and having a bubble of carpet for no apparent reason.


Seriously!  Could you imagine doing a job like this and thinking it had been done well?  I just don't get it.  

To top it off, the carpet was the only thing to happen so far this week!  I know it will all eventually get there but it feels like it's slowed down to a snails pace again.

Left to do:

1. Tyrell's inspection (might have been done, need to get a copy)
2. Brickwork around the front
3. WIP and WIR shelving
4. Correction of shower door in ensuite 1
5. Door service including fixing the gaps at the base of the French Doors
6. Roof service
7. Tiling in ensuite 1
8. Removing towel rails & replacing the tiles they were attached to in ensuite 1 & bathroom
9. Silicone in bathrooms
10. Touch catches in kitchen
11. Privacy lock in bathroom (missing)
12. Missing wardrobe handles in Rumpus Bedroom
13. Missing shower head in Bathroom
14. Garage step
15. Manhole cover
16. Lighting in bedrooms


Wish us luck!